Tesselion : Adaptive Quadrilateral Flat Panelization

Construction Day 17_5:4:08

Posted in Construction by sjet on May 5th, 2008

A few photos as the canopy touches down with the ramp. 

Assembly has been completed: (Final photos will be up soon!)

-All panels are in place & tightened with lock nuts (except 1 which needs to be cut & shipped to site).

-The entire construction including folding, rivetting, bolting, installing & tightening took roughly 7 (12 hour) days for with only 1 person.